Water Connection Fees

When a homeowner or a business wishes to connect to the City water system, a connection fee is assessed and then a permit issued for construction.

The connection fee is related to the hydraulic capacity of the water system. The connection charge represents the contributive share of the cost to expand existing facilities, or construct new water facilities. In other words, the amount of water we need to supply to our customers is directly related to their demand on the system. Customers placing a greater burden on the water system should bear a greater share of the costs. As development occurs, population increases, and there is a larger demand for water. Connection fees are the only funding source we have to build new facilities that will ensure fire protection and a continuing supply of potable water for our customers.

     

Per the City of Redding's Municipal Code, the following charges shall be paid to the City prior to the issuance of any water connection permit, or any physical connection to the water system from the premises to which the charges apply.

Each premise, as defined in Section 14.08.010, applying for a new water service, as distinguished from a change in location, shall pay the current connection charge, based on meter size, per household equivalent, as follows:

Water Connection Fees Per Municipal Code Section 16.20.080
Meter Size AWWA Rated
Capacity/GPM
HE* Ratio Fee/HE Connection Charge
Effective 01/01/09
5/8" 20 1 $6,895.79 $6,895.79
3/4" 30 1.5 $6,895.79 $10,343.69
1" 50 2.5 $6,895.79 $17,239.48
1 1/2" 100 5 $6,895.79 $34,478.95
2" 160 8 $6,895.79 $55,166.32
3" 320 16 $6,895.79 $110,332.64
4" 500 25 $6,895.79 $172,394.75
6" 1000 50 $6,895.79 $344,789.50
8" 1600 80 $6,895.79 $551,663.20
*HE = Household equivalent (the water usage for the standard residential household)

Water Meter Set Charges
Meter Size Complete Service Meter Only
5/8" $1,190.00 $96.00
3/4" $1,240.00 $115.00
1" $1,300.00 $150.00
1 1/2" $1,730.00 $360.00
2" $1,830.00 $430.00
3" Time & materials plus 15% Time & materials plus 15%
4" Time & materials plus 15% Time & materials plus 15%
6" Time & materials plus 15% Time & materials plus 15%
8" Time & materials plus 15% Time & materials plus 15%
     

In addition, the following charges will apply:

Miscellaneous Charges
Front Footage
Construction Charge
Paving Cut Charge
Construction Charge
Hydrant Meter/
Construction Water
Split Existing
5/8" Service
$17.67 $680.00 $25.00 ($250.00 total deposit) $540.00

Effective January 1, the respective fees shall be increased by the Construction Cost Index in the most recent November Engineering News Record.

For hydrant meters, commodity charge for all consumption is billed monthly at the current rate.



If you have questions or would like more information about Connection Fees,
please call: (530) 225-4020, e-mail or write to us at the address below:

Development Services

City of Redding
777 Cypress Avenue
Redding, CA 96001

watergrp@ci.redding.ca.us

Water Supply | Water Treatment | Water Distribution | Water Conservation
Consumer Confidence Reports | Customer Service | Connection Fees and Rates
Redding Water System | Site Index | Links | Information Request
Water Utility Home | Redding Municipal Utilities Home | City of Redding Home